速丰工程规划数据重点地区速生丰产用材林基地建设项目表(人造板原料林基地项目)
收藏国家林业和草原科学数据中心2002-06-22 更新2024-03-06 收录
下载链接:
https://www.forestdata.cn/dataDetail.html?id=CSTR:17575.11.0120180622047.020001.V1
下载链接
链接失效反馈官方服务:
资源简介:
本数据记录了速丰林规划数据库中重点地区速生丰产用材林基地建设项目表(人造板原料林基地项目)的区域、省 、项目名称 、项目关联企业 、项目建设范围 、建设规模(万公顷)总计 、建设规模(万公顷)一期(2001-2005) 、建设规模(万公顷)二期(2006-2010) 、建设规模(万公顷)三期(2011-2015) 、培育方式(万公顷)新造 、培育方式(万公顷)改培 、年产量预测(万立方米) 、项目关联企业生产规模及发展规模等记录。速丰林规划数据库包括速丰林建设各个项目一期(2001-2005)、二期(2006-2010)和三期(2011-2015)的建设规模、范围、培育方式、年产量预测以及工程建设投资等信息。可为研究速生丰产林工程的执行情况和我国木材产量预测提供详实资料参考。
This dataset records the entries in the Fast-growing and High-yield Timber Forest Planning Database, specifically the list of key regional fast-growing and high-yield commercial timber forest base construction projects (wood-based panel raw material forest base projects), including region, province, project name, project-related enterprises, project construction scope, total construction scale (10,000 hectares), construction scale for Phase I (2001–2005) (10,000 hectares), construction scale for Phase II (2006–2010) (10,000 hectares), construction scale for Phase III (2011–2015) (10,000 hectares), new afforestation area (10,000 hectares) under cultivation mode, improved cultivation area (10,000 hectares) under cultivation mode, annual production forecast (10,000 cubic meters), and the production and development scales of project-related enterprises, among other metrics. The Fast-growing and High-yield Timber Forest Planning Database contains information on construction scale, scope, cultivation method, annual production forecast, and engineering construction investment for all fast-growing and high-yield timber forest construction projects across Phase I (2001–2005), Phase II (2006–2010), and Phase III (2011–2015). This dataset can provide detailed reference materials for research on the implementation status of fast-growing and high-yield timber forest projects and timber production forecasting in China.
提供机构:
国家林业和草原科学数据中心
创建时间:
2002-06-22
搜集汇总
数据集介绍

背景与挑战
背景概述
该数据集详细记录了人造板原料林基地项目的建设规模、范围、培育方式和年产量预测等信息,覆盖2001-2015年三期建设数据,为研究速生丰产林工程和木材产量预测提供详实资料。数据质量高,错误率低,属于林业工程建设情况数据库。
以上内容由遇见数据集搜集并总结生成



