Environmental watering data for the Basin Plan Evaluation 2020
收藏Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/environmental-watering-basin-evaluation-2020/2988049
下载链接
链接失效反馈官方服务:
资源简介:
### Overview\r\nThe reporting of this data is required to meet statutory obligations under Schedule 12 of the Basin Plan (2012). Reporting of environment water use refers to Matter 9.3 of Schedule 12 of the Basin Plan (2012). This reporting refers to the annual reporting of all environment water use, by all relevant environmental water holders, to the MDBA for consolidation and publication.\r\n\r\nThis measure allows all environmental water holders to continuously assess and manage their environmental water holdings, and enhances the coordination and delivery of environmental water through sharing and publication of this information.\r\n\r\n\r\n### Attribution\r\nAll relevant environmental water holders contribute to matter 9.3 reporting data on an annual basis, to fulfil statutory obligations under the Basin Plan (2012).\r\n\r\nEnvironmental Water Holders include\r\n\r\nCommonwealth Environment Water Holder (CEWH)\r\n\r\nVictorian Environmental Water Holder (VEWH)\r\n\r\nSouth Australia\r\n\r\nNew South Wales\r\n\r\nAustralian Capital Territory\r\n\r\nQueensland\r\n\r\nMDBA (The Living Murray)\r\n\r\n\r\n\r\n###Links to published reports annually\r\n\r\n[Basin Plan Implementation Report 2016-2017](https://www.mdba.gov.au/publications-and-data/publications/basin-plan-implementation-reports-2016-17)\r\n\r\n[Basin Plan Implementation Report 2017-2018](https://www.mdba.gov.au/publications-and-data/publications/basin-plan-implementation-report-2017-18)\r\n\r\n[Basin Plan Implementation Report 2018-2019](https://www.mdba.gov.au/publications-and-data/publications/basin-plan-implementation-reports-2018-19)\r\n\r\n###Basin Plan Evaluation 2020 products\r\nA range of products have been developed and released as part of the Basin Plan Evaluation 2020.\r\n\r\n[Link to content landing zone](https://www.mdba.gov.au/water-management/basin-plan/basin-plan-evaluations/2020-basin-plan-evaluation)\r\n\r\n[Link to reports and data page](https://www.mdba.gov.au/publications-and-data/publications/2020-basin-plan-evaluation-reports-and-data)\r\n\r\n[Link to Environmental Watering dashboard](https://app.powerbi.com/view?r=eyJrIjoiZWM4YmFhZDAtODI4ZC00YjYxLTk2ZTYtZWE3NGNkNmMwN2M1IiwidCI6IjFlMjU3ZjA5LWQ5NmItNDkxYS1hNDg4LWRjMmEzOTljYmVlNSJ9)
### Overview
本数据的报告需满足《流域规划(2012)》附表12规定的法定义务。环境用水报告涉及《流域规划(2012)》附表12第9.3项内容。本报告指所有相关环境用水持有者向MDBA提交的年度环境用水使用情况报告,以供MDBA整合和发布。
该措施使所有环境用水持有者能够持续评估和管理其环境用水储备,并通过信息共享与发布增强环境用水的协调与调配。
### Attribution
所有相关环境用水持有者每年为第9.3项报告数据提供信息,以履行《流域规划(2012)》规定的法定义务。
环境用水持有者包括
联邦环境用水持有者(CEWH)
维多利亚州环境用水持有者(VEWH)
南澳大利亚州
新南威尔士州
澳大利亚首都领地
昆士兰州
MDBA(活 Murray 计划)
### Links to published reports annually
[《流域规划实施报告2016-2017》](https://www.mdba.gov.au/publications-and-data/publications/basin-plan-implementation-reports-2016-17)
[《流域规划实施报告2017-2018》](https://www.mdba.gov.au/publications-and-data/publications/basin-plan-implementation-report-2017-18)
[《流域规划实施报告2018-2019》](https://www.mdba.gov.au/publications-and-data/publications/basin-plan-implementation-reports-2018-19)
### Basin Plan Evaluation 2020 products
作为2020年流域规划评估的一部分,已开发并发布了一系列成果。
[内容着陆区链接](https://www.mdba.gov.au/water-management/basin-plan/basin-plan-evaluations/2020-basin-plan-evaluation)
[报告与数据页面链接](https://www.mdba.gov.au/publications-and-data/publications/2020-basin-plan-evaluation-reports-and-data)
[环境用水仪表板链接](https://app.powerbi.com/view?r=eyJrIjoiZWM4YmFhZDAtODI4ZC00YjYxLTk2ZTYtZWE3NGNkNmMwN2M1IiwidCI6IjFlMjU3ZjA5LWQ5NmItNDkxYS1hNDg4LWRjMmEzOTljYmVlNSJ9)
提供机构:
data.gov.au



