Daily load and flexibility profiles (2030) according to the Active Economy scenario of the electricity transmission system from Portugal – ATTEST project
收藏NIAID Data Ecosystem2026-03-13 收录
下载链接:
https://zenodo.org/records/6401550
下载链接
链接失效反馈官方服务:
资源简介:
This dataset was prepared under the framework of the ATTEST project, financed by the European Commission with grant number 864298. The dataset contains information about the full transmission test network of Portugal as in 2030, considering an Active Economy scenario which is more trending towards renewables and electrification of the economy. The grid topology has been anonymized and contains 312 nodes, 592 branches and 8 interconnections with Spain. It is operated at 400 kV, 220 kV and 150 kV. There are 299 generators, and a label classifies each of them according to the generation technology type (e.g., Fossil Gas, Wind Onshore, etc.). A network model (MatPower format) including the grid information and considering realistic assumptions for unknown data was built from scratch taking into account the available public data released by the Portuguese TSO as in 2020 and then updated to 2030 conditions. The auxiliary spreadsheet contains the following hourly data: load data, generator status obtained from unit commitment, regulated voltage magnitude setpoint of each generator, transformer tap ratio and aggregated flexibility per consumption node.
本数据集依托欧盟委员会资助项目ATTEST(资助编号:864298)框架编制完成。数据集包含葡萄牙2030年完整输电测试网络的相关信息,对应场景为更偏向可再生能源发展与经济电气化的活跃经济(Active Economy)场景。该电网拓扑已完成匿名化处理,包含312个节点、592条支路以及8条与西班牙的互联线路,运行电压等级涵盖400 kV、220 kV与150 kV。数据集中共包含299台发电机组,通过标签对每台机组的发电技术类型进行分类(例如化石燃气、陆上风电等)。基于葡萄牙输电系统运营商(Transmission System Operator, TSO)2020年发布的公开可用数据,我们从零构建了包含电网信息、并针对未知数据采用合理假设的MatPower格式电网模型,随后将该模型更新至2030年的场景条件。辅助电子表格包含以下逐小时数据:负荷数据、基于机组组合得到的发电机组运行状态、每台发电机组的调压电压设定值、变压器分接头档位,以及各负荷节点的聚合灵活性资源。
创建时间:
2022-04-22



