five

Sagamore Bridge Crossover Construction

收藏
DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2284/1
下载链接
链接失效反馈
官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=8zPKWqVAJ4k)]]</p> <p>The Sagamore Parkway bridge across the Wabash River between West Lafayette and Lafayette, Indiana, spanned over 900 feet. The nearly $13,400,000 project contract was awarded to Superior Construction. The project includes removing the existing bridge and building a new structure with similar alignment to replace it. The new structure features a concrete bulb-tee design and is planned to span nearly 940 feet with eight spans. The structure will include two standard 12-foot travel lanes, 6-foot left shoulders, 11-foot right shoulders, and a 10-foot pedestrian walkway. The bridge is expected to open to traffic in the summer of 2018, and the total project has a completion date of June 2019. Maintenance of the traffic switch removing traffic from the eastbound bridge occurred on June 10, 2016.</p> <p>The project is located at <a href="https://www.google.com/maps/@40.4514114,-86.8940583,296m/data=!3m1!1e3">40.4514114,-86.8940583</a>.</p>

本视频记录了Sagamore Parkway大桥重建项目中临时转换道的施工过程。
提供机构:
Purdue University Research Repository
创建时间:
2016-11-18
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作