five

Closures

收藏
City of Wodonga Open Data Hub2026-05-16 收录
下载链接:
https://cow-open-data-hub-cityofwodonga.hub.arcgis.com/datasets/CityOfWodonga::closures
下载链接
链接失效反馈
官方服务:
资源简介:
<p style='background-color:rgb(255, 255, 255); border:0px solid currentcolor; box-sizing:border-box; color:rgb(74, 74, 74); font-family:&quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px; font-style:normal; font-variant-caps:normal; font-variant-ligatures:normal; font-weight:400; letter-spacing:normal; margin:0px 0px 1.5rem; text-align:start; text-decoration-color:initial; text-decoration-style:initial; text-indent:0px; text-transform:none; word-spacing:0px;'>The <i>Upcoming Roadworks</i> feature service provides authoritative information on roadworks that have received council consent. It includes four layers representing different types of traffic control measures:</p><ul><li><strong>Disruptions</strong> – Linear features showing partial impacts such as slowdowns or shoulder work.</li><li><strong>Closures</strong> – Linear features representing segments of road that are fully closed, including single-lane alternating traffic treated as closures.</li><li><strong>Detours</strong> – Linear features representing designated alternative routes around closures or blocks.</li></ul><p style='background-color:rgb(255, 255, 255); border:0px solid currentcolor; box-sizing:border-box; color:rgb(74, 74, 74); font-family:&quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px; font-style:normal; font-variant-caps:normal; font-variant-ligatures:normal; font-weight:400; letter-spacing:normal; margin:0px 0px 1.5rem; text-align:start; text-decoration-color:initial; text-decoration-style:initial; text-indent:0px; text-transform:none; word-spacing:0px;'>Each feature includes a <strong>start and end time</strong>, enabling time-enabled analysis, allowing users to explore traffic impacts across different periods.</p><p style='background-color:rgb(255, 255, 255); border:0px solid currentcolor; box-sizing:border-box; color:rgb(74, 74, 74); font-family:&quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px; font-style:normal; font-variant-caps:normal; font-variant-ligatures:normal; font-weight:400; letter-spacing:normal; margin:0px 0px 1.5rem; text-align:start; text-decoration-color:initial; text-decoration-style:initial; text-indent:0px; text-transform:none; word-spacing:0px;'>Please note:</p><ul><li>Only roadworks consented by council are included. For roads managed by other agencies, please refer to their respective open data platforms.</li><li>While care is taken to provide accurate information, on-ground conditions may change. Always drive safely and follow road signage and current conditions.</li></ul>

即将开展的道路施工(Upcoming Roadworks)要素服务提供已获得市政委员会审批的道路施工权威信息。该服务包含四个图层,分别对应不同类型的交通管控措施: - **交通扰动路段(Disruptions)**:用于展示局部交通影响的线性要素,例如通行缓滞或路肩施工作业。 - **道路封闭路段(Closures)**:用于表示完全封闭的道路区段的线性要素,其中单车道交替通行场景也被纳入封闭范畴。 - **绕行路线(Detours)**:用于表示绕行封闭或阻塞路段的指定替代路线的线性要素。 每个要素均包含**起始与结束时间**,支持时态分析,便于用户探究不同时段的交通影响状况。 请注意: - 仅收录已获得市政委员会审批的道路施工信息。其他机构管理的道路,请查阅其对应的开放数据平台。 - 尽管已尽力确保信息准确,但实地路况可能发生变化。请务必安全驾驶,遵循道路标识及当前路况指示。
提供机构:
Wodonga City Council
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作