The report cover the operations for the period of PPL 153. PPL 153 consists of a number of pipelines: The main pipeline being the 196.5km Gas Collection Header pipeline which connects the Woleebee Creek Central Processing Plant, with the Ruby Jo Central Processing Plant, to the termination point being the connection to the E05 Export Pipeline, which is covered under PPL 154. PPL 153 is in steady state operation with the same planned for the next period.
本报告涵盖PPL 153许可周期内的运营情况。PPL 153包含多条管道:其中主管线为196.5千米的集气总管管道(Gas Collection Header pipeline),该管线连接沃利比溪中央处理厂(Woleebee Creek Central Processing Plant)与鲁比·乔中央处理厂(Ruby Jo Central Processing Plant),其终端接点接入E05外输管道(E05 Export Pipeline),后者的运营由PPL 154覆盖。PPL 153目前处于稳态运行状态,下一运营周期将维持相同的运行计划。