Calculation models: The LT-bridge construction method for the material-saving and fast construction of post-tensioned concrete bridges
收藏DataCite Commons2024-08-27 更新2025-04-16 收录
下载链接:
https://researchdata.tuwien.at/doi/10.48436/bjhgw-a8236
下载链接
链接失效反馈官方服务:
资源简介:
Calculation models behind the paper on the LT-bridge construction method for the material-saving and fast construction of post-tensioned concrete bridges (https://doi.org/10.1002/best.202400007).
The calculation models on the basis of which the formwork, reinforcement, and tendon plans were created are provided here.The *.sofistik and *.dwg files can be opened with the Sofistik 2022 software.The *.inc files can be opened with the INCA2 software (https://www.u-pfeiffer.de/inca2/inca2-09.html).If any further information is needed please contact franz.untermarzoner@tuwien.ac.at
关于LT桥施工法在节约材料与快速建造后张法混凝土桥梁(post-tensioned concrete bridges)中的应用的论文背后的计算模型(https://doi.org/10.1002/best.202400007)。本文提供了用于生成模板、钢筋及预应力筋方案的计算模型。*.sofistik和*.dwg格式文件可通过Sofistik 2022软件打开。*.inc格式文件可通过INCA2软件打开(https://www.u-pfeiffer.de/inca2/inca2-09.html)。如需进一步信息,请联系franz.untermarzoner@tuwien.ac.at。
提供机构:
TU Wien
创建时间:
2024-08-27



