##__Part 1 - To be read by the customer:__##\r\n* I/We, the undersigned, hereby agree and acknowledge that the information to be provided by Bundaberg Regional Council does not have guaranteed levels of accuracy,\r\n* I/We are aware that Bundaberg Regional Council has compiled these records based upon data at its disposal which has not been independently verified by Bundaberg Regional Council staff or agents,\r\n* I/We accept receipt of the relevant data on the basis that same is provided for our assistance and reference only and that should we seek to rely upon same that we shall obtain or retain independent professional advice to verify the accuracy of the relevant material,\r\n* I/We are aware from the contents of this document, or from independent enquiry, that the material provided by Council is not survey accurate and that same is prepared and based upon material which Bundaberg Regional Council has obtained from the Queensland State Government's Department of Natural Resources and Mines and that same is provided as a public service without acceptance of responsibility or liability from Bundaberg Regional Council nor its Staff or agents,\r\n* I/We acknowledge that Council's engineering and professional staff have not provided us with any representations or advice upon the data provided and that we accept same on the basis set out herein.\r\n\r\n##__Part 2 - Duty of care towards Council - by the customer:__##\r\nWhen working in the vicinity of Council's infrastructure you have a legal duty of care that must be observed. The following must be considered:\r\n\r\n* It is the responsibility of the customer (which term shall include any consultant engaged by the owner including a consultant, architect, consulting engineer, developer, builder or other contractor) to design for minimal impact on Council's infrastructure, and\r\n* It is the customer's and or owner's responsibility to: request plans at a reasonable time before construction, visually locate infrastructure where construction activities may damage or interfere with infrastructure and contact Council if the construction is located near Council's infrastructure (refer essential precautions section). Note: Council can locate infrastructure and improvements on your behalf - refer to section "Contact numbers - for location of Infrastructure".\r\n\r\n##__Part 3 - Important information for the customer:__##\r\n__Damange to Council Infrastructure -__\r\n\r\n* The Customer is responsible for all infrastructure damage when works commence prior to obtaining plans, appropriately locating Council's infrastructure, or failing to observer the essential precautions,\r\n* Bundaberg Regional Council reserves the right to recover compensation for losses and damages to its infrastructure or other property including consequential losses.\r\n\r\n__Concerning Council's plans -__\r\n* Council's plans and information provided are valid for 60 days from date of issue,\r\n* Bundaberg Regional Council retains copyright in all plans and details provided in conjunction with your request,\r\n* Bundaberg Regional Council plans or other details are provided for the use of the applicant, its servants, or agents and shall not be used for any unauthorised purpose,\r\n* Bundaberg Regional Council, its servants or agents shall not be liable for any loss or damage caused or occasioned by the use of plans and or details so supplied to the applicant, its servants and agents and the applicant agrees to indemnify Council against any claim or demand for any such loss or damage.\r\n\r\n__Essential precaustions and approach distances -\r\nNote: if the following clearance cannot be maintained Contact Council immediately for advice.__\r\n\r\n* On receipt of plans and sketches and before commencing excavation work or similar activities near Council's infrastructure, carefully locate the infrastructure, to avoid damage (refer below if you would like Council to locate the infrastructure). Undertake prior manual exposure such as potholing (by hand) when intending to excavate or work closer to Council's infrastructure than the following distances:\r\n- In footpaths, where it could be reasonably assumed that the infrastructure would be within 1.5 metre,\r\n- In non established areas or unformed reserves, roadways, footpaths or alike minimum approach distance 2.5 metres,\r\n- In rural/non urban areas which may have wider variation than given above the following should be observed:\r\n-- 10 metres for major rising mains, trunk mains, etc,\r\n-- 5 metres for other infrastructure.\r\n* Maintain the following minimum clearance between construction activity and actual location of Council's infrastructure (unless previously approved in an operational works approval)\r\n- Jackhammers pneumatic breakers 1.0m\r\n- Vibrating plate or wacker packer compaction 1.0m\r\n- Boring equipment 1.0m\r\n- Heavy traffic (over three tonnes) 1.0m\r\n- Mechanical Excavators 1.0m\r\n\r\n#__Contact numbers - for location of Infrastructure:__#\r\nLocation of infrastructure can be provided at a __cost to the customer__, please refer to the Customer Call Centre on 1300 883 699 to obtain a quote.\r\n\r\n\r\n#__Data Field Descriptions__#\r\n##__Sewerage Mains__##\r\n* Asset ID (Asset_ID) - Asset Identifier\r\n* Sewer Service Area (zone) - Name of declared benefited area\r\n* Asset Class (assetClass) - Name of treatment plant that services this area\r\n* Asset Type (assetType) - Categorisation of the Asset\r\n* Group Name (segmentID) - Name of Facility that connects to this asset\r\n* Hiearchy (hierarchy) - Categorisation of the Asset\r\n* Pipe Material (materialType) - Type of material used for this asset\r\n* Pipe Length m (length) - Measured length of asset\r\n* Pipe Depth m (depth) - Depth from ground level to top of asset in metres\r\n* Pipe Diameter mm (diameter) - Diameter of pipe in mm\r\n* Upstream Invert Level m (upstreamManholeIL) - \r\n* Downstream Invert Level m (downstreamManholeIL) - \r\n* Pipe Class (pipeClass) - Pipe classification\r\n\r\n##__Sewerage Manholes__##\r\n* Asset ID (Asset_ID) - as above\r\n* Water Service Area (zone) - as above\r\n* Group Name (segmentID) - as above\r\n* Pipe Diameter mm (dimensionsDiameter) - as above\r\n* Locality (locality) - Suburb Locality\r\n* Road Name (roadName) - Road Name for location of asset\r\n* Hierarchy (hierarchy) - Categorisation of the Asset
##__第一部分 - 客户阅读内容:__##
* 本人/我们,签署人,特此同意并确认班达伯格地区议会(Bundaberg Regional Council)提供的信息不保证准确度等级,
* 本人/我们知晓班达伯格地区议会基于其可获取的数据编制了这些记录,且该数据未经议会工作人员或代理人独立验证,
* 本人/我们确认收到相关数据,其仅用于协助和参考;若拟依赖该数据,本人/我们应获取或聘请独立专业建议以验证相关材料的准确性,
* 本人/我们从本文件内容或独立查询中知晓,议会提供的材料并非测量精度,且其编制基于班达伯格地区议会从昆士兰州政府自然资源与矿业部获取的材料,该材料作为公共服务提供,班达伯格地区议会及其工作人员或代理人不承担任何责任或义务,
* 本人/我们确认,议会的工程和专业人员未就所提供的数据向我们作出任何陈述或建议,且我们基于本文件所列条款接受该数据。
##__第二部分 - 对议会的注意义务:__##
在议会基础设施附近作业时,您负有法律上的注意义务,必须遵守以下规定:
* 客户(该术语包括业主聘请的任何顾问,如顾问、建筑师、咨询工程师、开发商、建筑商或其他承包商)有责任设计对议会基础设施影响最小的方案,
* 客户和/或业主有责任:在施工前合理时间内申请图纸;目视定位可能因施工活动受损或受干扰的基础设施;若施工位于议会基础设施附近,联系议会(参考必要预防措施部分)。注:议会可代您定位基础设施及改良设施——参考“基础设施定位联系电话”部分。
##__第三部分 - 客户重要信息:__##
__议会基础设施损坏 -__
* 若工程在获取图纸、适当定位议会基础设施或未遵守必要预防措施前开工,客户应对所有基础设施损坏负责,
* 班达伯格地区议会保留追讨其基础设施或其他财产损失(包括间接损失)赔偿的权利。
__关于议会图纸 -__
* 议会提供的图纸和信息自签发日起60天内有效,
* 班达伯格地区议会保留与您的请求相关的所有图纸和细节的版权,
* 议会图纸或其他细节仅供申请人及其雇员或代理人使用,不得用于任何未经授权的用途,
* 班达伯格地区议会及其雇员或代理人不对申请人及其雇员、代理人使用所提供图纸和/或细节造成或引发的任何损失或损害负责,申请人同意就任何此类损失或损害的索赔或要求向议会作出赔偿。
__必要预防措施及接近距离 -
注:若无法保持以下净距,请立即联系议会获取建议。__
* 收到图纸和草图后,在议会基础设施附近开始挖掘或类似活动前,应仔细定位基础设施以避免损坏(如希望议会定位基础设施,请参考下文)。打算在距离议会基础设施小于以下距离处挖掘或作业时,应事先进行手动暴露(如人工探坑):
- 在人行道区域,若合理推测基础设施位于1.5米范围内,
- 在未建成区域或未平整保留地、道路、人行道等区域,最小接近距离为2.5米,
- 在可能与上述距离有较大差异的农村/非城市区域,应遵守以下规定:
-- 主要上升管、主干管等为10米,
-- 其他基础设施为5米。
* 施工活动与议会基础设施实际位置之间应保持以下最小净距(除非运营工程批准中已事先批准):
- 风镐、气动破碎锤:1.0米
- 振动平板或冲击夯压实:1.0米
- 钻孔设备:1.0米
- 重型交通(超过3吨):1.0米
- 机械挖掘机:1.0米
#__基础设施定位联系电话:__#
基础设施定位服务需客户承担费用,请致电客户呼叫中心1300 883 699获取报价。
#__数据字段描述__#
##__污水主管__##
* 资产ID(Asset_ID)-资产标识符
* 污水服务区(zone)-已声明受益区域名称
* 资产类别(assetClass)-服务该区域的处理厂名称
* 资产类型(assetType)-资产分类
* 组名(segmentID)-连接至该资产的设施名称
* 层级(hierarchy)-资产分类
* 管道材料(materialType)-资产所用材料类型
* 管道长度(米)(length)-资产测量长度
* 管道深度(米)(depth)-从地面到资产顶部的深度(米)
* 管道直径(毫米)(diameter)-管道直径(毫米)
* 上游管底标高(米)(upstreamManholeIL)-
* 下游管底标高(米)(downstreamManholeIL)-
* 管道等级(pipeClass)-管道分类
##__污水检查井__##
* 资产ID(Asset_ID)-同上
* 供水服务区(zone)-同上
* 组名(segmentID)-同上
* 管道直径(毫米)(dimensionsDiameter)-同上
* 地点(locality)-郊区地点
* 道路名称(roadName)-资产所在道路名称
* 层级(hierarchy)-资产分类