WestConnex M4-M5 Link : Rozelle Interchange - modification : Iron Cove ventilation underground : response to submissions report
收藏Research Data Australia2024-12-21 收录
下载链接:
https://researchdata.edu.au/westconnex-m4-m5-submissions-report/1765509
下载链接
链接失效反馈官方服务:
资源简介:
A Modification report (dated November 2019) for the proposed Modification was prepared in accordance with Section 5.25 of the EP&A Act. The Modification report provided full details of the proposed changes to the Approved Project as part of the Modification and an environmental assessment of the proposed changes.\r\nDuring the public exhibition of the Modification report, submissions were received by DPIE. The Planning Secretary provided copies of the submissions to Transport for NSW. This Response to submissions (this Report) has been prepared to respond to these submissions. \r\nThe Response to submissions (this Report) will be provided to DPIE for consideration. After DPIE completes its assessment, an Environmental Assessment Report will be prepared for the Planning Secretary, which may include additional recommended Planning Approval Conditions of Approval (CoAs). The assessment report will then be provided to the NSW Minister for Planning and Public Spaces, to determine the Modification. \r\nA copy of this Response to submissions will be published by DPIE on the DPIE Major Project’s website. The NSW Minister for Planning and Public Spaces determination, including any Planning Approval conditions (if relevant) and the Secretary’s report, will be published on DPIE’s website following determination. This Response to submissions report has the following structure: • Part A – Introduction and overview of consultation and submissions received • Part B – Response to key stakeholder submissions • Part C – Response to community submissions • Part D – Environmental Management Measures, Conditions of Approval and conclusion • References • Appendix A – Submission identification number reference table
根据《EP&A法案》第5.25条,已编制拟议修改的修改报告(日期为2019年11月)。该修改报告详细阐述了作为修改内容一部分的已批准项目拟议变更的全部细节,以及对拟议变更的环境评估。
在修改报告公开征询意见期间,DPIE收到了公众提交的意见。规划秘书将这些意见副本提交给Transport for NSW。本意见书回应报告(本报告)旨在对这些意见作出回应。
本意见书回应报告(本报告)将提交给DPIE供其审议。DPIE完成评估后,将为规划秘书编制一份环境评估报告,其中可能包含额外建议的规划批准条件(CoAs)。随后,该评估报告将提交给新南威尔士州规划与公共空间部长,由其对修改方案作出决定。
本意见书回应报告的副本将由DPIE发布在其重大项目网站上。新南威尔士州规划与公共空间部长作出的决定(包括任何相关规划批准条件及秘书报告)将在决定作出后发布于DPIE网站。本意见书回应报告的结构如下:• A部分——引言及征询意见与收到意见概述• B部分——对主要利益相关方意见的回应• C部分——对社区意见的回应• D部分——环境管理措施、批准条件及结论• 参考文献• 附录A——意见书识别号参考表