0060006
收藏DataCite Commons2025-03-14 更新2025-04-15 收录
下载链接:
http://esdcdoi.esac.esa.int/doi/html/data/astronomy/integral/0060006.html
下载链接
链接失效反馈官方服务:
资源简介:
Calibration observation 6: background study requested by IBISThe observations of this proposal will be executed in parallel to the SPI commissioning activitiesduring the Com-PV phase transition revolution 11-13. This proposal contains also dummy observationswhich are only used to force OSS to a certain behaviour (set TM allocation or define slew end point).obs1 force pointing and set PST SPI 46 TM taken from JEM-X (5 pkts from each -> JEMX only gets 4pkts)obs2 parallel to SPI-318 (SPI 46 TM taken from JEM-X) instrument configuration left for SPI-320obs3 parallel to SPI-330a PSD library upload (nominal TM allocation)obs4 dummy obs to set TM allocation for SPI-330b data acquisition (SPI 68pkts taken from IBIS 104)obs5 PV nominal operation. [truncated! Please see actual data for full text]
校准观测6:由IBIS提出的背景研究。本提案的观测任务将在Com-PV相变旋回11-13期间与SPI调试活动并行开展。本提案还包含若干虚拟观测任务,仅用于将OSS强制设置为特定行为模式,例如配置遥测(Telemetry,TM)分配或定义快速机动指向终点。
观测1:用于强制指向,并设置从JEM-X获取的PST格式SPI 46遥测数据包(每个源数据包取5个分包,即JEM-X仅接收4个分包)
观测2:与SPI-318并行开展(遥测数据包采用取自JEM-X的SPI 46格式),仪器配置保留至SPI-320
观测3:与SPI-330a并行开展,包含PSD库上传(遥测分配为标称模式)
观测4:虚拟观测任务,用于为SPI-330b配置遥测分配并开展数据采集(从IBIS获取104个遥测数据包,其中SPI占用68个)
观测5:PV标称运行模式。[文本已截断!请查阅实际数据源以获取完整内容]
提供机构:
European Space Agency
创建时间:
2025-03-14



