通过采集位置、实际高度、模板受压、支架水平位移及轴力等数据,实时分析计算倾斜度、位移、模型沉降、等运行数据,实时分析对立杆倾斜角度、模板沉降、支架水平位移及组成均荷载,并对上述参数进行实时预警,及时发现潜在的安全隐患,通过声光报警器进行预警、报警,并采取相应的措施避免事故发生。1.数据来源 在施工现场安装终端控制仪、综合分析仪、无线倾角计、无线位移计、无线荷重传感器、无线声光报警器等设备,采集位置、实际高度、模板受压、支架水平位移及轴力等数据。 2.数据处理 混凝土高支模的状态通过其工作时的倾斜角度、模型沉降、位移以及荷载的组成均荷载等参数,来判断其工作状态是否正常; 2.1在系统中设置倾斜角度、模型沉降、位移等数据结合实时分析荷载的组成均荷载的参数预警值; 2.2通过采集的数据,分析混凝土高支模的倾斜角度、模型沉降、位移,采用以下公式实时分析荷载的组成均荷载Q=(25h+a+w)*i 其中Q为荷载的组成均荷载,h为高支模的板厚,a为模板木方的自重,w为施工均布活荷载,i为分项系数。 2.3 将上述分析数据采用多通道实时独立对比方法,将对应参数预警值与实时采集数据进行对比分析; 3.数据应用 通过上述分析计算实现对立杆倾斜、模板沉降、支架水平位移及轴力的实时预警,及时发现潜在的安全隐患,通过声光报警器进行预警、报警,并采取相应的措施避免事故发生。

By collecting data such as position, actual height, formwork pressure, support horizontal displacement and axial force, this system conducts real-time analysis and calculation of operating parameters including inclination, displacement and formwork settlement, and performs real-time analysis on parameters such as vertical rod inclination angle, formwork settlement, support horizontal displacement and combined uniform load, then carries out real-time early warning on the above parameters to detect potential safety hazards in time, issue warnings and alarms via audible and visual alarms, and take corresponding measures to avoid accidents. 1. Data Source Install terminal controllers, comprehensive analyzers, wireless inclinometers, wireless displacement meters, wireless load sensors, wireless audible and visual alarms and other equipment at the construction site to collect data including position, actual height, formwork pressure, support horizontal displacement and axial force. 2. Data Processing The working status of the concrete high formwork support is judged by parameters such as its operating inclination angle, formwork settlement, displacement and combined uniform load of the applied load. 2.1 Set the early warning values for parameters including inclination angle, formwork settlement, displacement and the combined uniform load obtained from real-time load analysis in the system. 2.2 Analyze the inclination angle, formwork settlement and displacement of the concrete high formwork support based on the collected data, and calculate the combined uniform load Q in real time using the following formula: Q=(25h+a+w)*i Where Q is the combined uniform load, h is the thickness of the formwork slab, a is the self-weight of the formwork lumber, w is the construction uniform live load, and i is the partial safety factor. 2.3 Adopt the multi-channel real-time independent comparison method to conduct comparative analysis between the corresponding parameter early warning values and the real-time collected data. 3. Data Application Realize real-time early warning for vertical rod inclination, formwork settlement, support horizontal displacement and axial force through the above analysis and calculation, detect potential safety hazards in time, issue warnings and alarms via audible and visual alarms, and take corresponding measures to prevent accidents.
提供机构:
浙江中水数建科技有限公司
创建时间:
2023-09-12
搜集汇总
数据集介绍
main_image_url
特点
该数据集名为“混凝土高支模状态管理数据”,包含25252条记录,数据来源于企业,通过施工现场的传感器设备采集。数据集主要用于实时监测和预警混凝土高支模的倾斜角度、模型沉降、位移等参数,以预防安全事故的发生。
以上内容由遇见数据集搜集并总结生成