five

NOAA ARRA USVI Watershed Stabilization Project : Coral Bay Watershed Management Project, Carolina Valley drainage improvements NOAA American Recovery and Reinvestment Act of 2009 Coral Bay Watershed Management Project Carolina Valley drainage improvements

收藏
NOAA Institutional Repository2021-06-17 更新2026-04-25 收录
下载链接:
https://repository.library.noaa.gov/
下载链接
链接失效反馈
官方服务:
资源简介:
"The Carolina Valley Watershed contains one primary ghut (Main Ghut) and several other runoff pathways that drain a large uphill area with residential neighborhoods scattered across steep hillsides and accessed primarily by unpaved roads. Development and poor stormwater management has resulted in greater sediment and stormwater flows into the bay from this watershed. These actions plus erosion from unpaved roads have increased sedimentation (Photo 1). The goals of the five projects in this watershed are to build both a bioretention pond and a sediment retention basin to capture and control sediment-laden flows, stabilize three unpaved road areas, and implement other stormwater best management practices (BMPs); thereby reducing sediment entering Coral Bay"--Executive summary. 2012 CoRIS (Coral Reef Information System) Library Public Domain 1858
提供机构:
NOAA
创建时间:
2021-06-17
二维码
社区交流群
二维码
科研交流群
商业服务