遇见数据集

Code and data for: Timing or volume? Service-level sizing of battery swapping stations in joint DG–BSS planning

收藏
Zenodo2026-09-26 更新2026-10-01 收录
官方服务:

资源简介:

This record contains the code, network data, validation certificates and results that reproduce every table and figure of the article "Timing or volume? Service-level sizing of battery swapping stations in joint DG–BSS planning of radial distribution networks, with a certified optimality gap" (submitted to Sustainable Energy, Grids and Networks). Contents:- code/ – MATLAB/Octave planning platform v2.2.2 (backward/forward-sweep load flow, EVSI objective, battery-inventory station model with service level, DABC and other metaheuristics, DistFlow SOCP gap, statistics) with a regression suite of 386 checks.- code/data/ – IEEE 33-bus, 69-bus, 85-bus and 118-bus radial feeders (MATPOWER format) with provenance.- code/validation/ – pandapower load-flow certificate, SOCP exactness certificate, SciPy statistics certificate.- results/raw/ – results databases of all 600 main runs and 120 sensitivity runs (30 seeds each).- results/P1_analysis/ – CSV tables behind Tables 7–9 and the statistical tests.- paper_figures/ – Python scripts that draw Figs. 1–7. README.md gives the exact commands to reproduce the results. Tested with MATLAB R2023b and GNU Octave 8.4; Python 3 with cvxpy, clarabel and pandapower.

提供机构:
Zenodo
创建时间:
2026-09-26
二维码
社区交流群
二维码
科研交流群
商业服务