(Table 3) Calculated consolidation times for sedimentary sections of the Prydz Bay samples@en
收藏数据链接:
官方服务:
资源简介:
For T = 0.05 (and less), only the top of the sediment, immediately beneath the applied load, is consolidated, whereas for T = 1, the sedimentary section is fully consolidated throughout.
创建时间:
2026-04-09



