Inflow and meteorological data of the planned Longyangxia hydroâPV-wind power plant
收藏DataONE2021-04-21 更新2025-05-10 收录
下载链接:
https://search.dataone.org/view/sha256:404dc3fb7106419fd26a904b64f4c8e74332c3c220f194eca894e452fb5aa5c1
下载链接
链接失效反馈官方服务:
资源简介:
The monthly measured streamflow data recorded at Tangnaihe hydrological station were chosen to represent the monthly inflow data of the hydropower plant. Meteorological data including daily solar duration, temperature, and wind speed data in Gonghe station were provided to calculate the monthly PV power output and wind power output.
选取唐乃亥水文站(Tangnaihe hydrological station)实测月径流量数据,作为该水电站的月入库流量数据。提供共和站(Gonghe station)的气象数据,包括逐日日照时长、气温与风速数据,用于计算月光伏发电量与月风力发电量。
创建时间:
2025-04-25



