Supplementary Data for Comparative Study on the Use of S Curve-Bar Chart and Ms Project-Pdm Methods in Scheduling and Controlling Building Construction Project

收藏
DataCite Commons2022-02-02 更新2024-07-28 收录
下载链接:
https://figshare.com/articles/dataset/Supplementary_Data_for_Comparative_Study_on_the_Use_of_S_Curve-Bar_Chart_and_Ms_Project-Pdm_Methods_in_Scheduling_and_Controlling_Building_Construction_Project/14059202/1
下载链接
链接失效反馈
官方服务:
资源简介:
Building construction projects have very complex activities, so they require precise and accurate methods of scheduling and control. Using the right method, the project executor can carry out the project according to plan and can be controlled if there is schedule deviations. This study aims to compare the effectiveness of using the Bar Chart-curve-S and Ms. Project-PDM methods on scheduling and controlling building construction projects. The method used by contractors in scheduling and controlling a project is the Bar Chart-S curve and Ms. Project-PDM method.

建筑工程项目的施工作业极为复杂,因此需要精准可靠的进度规划与管控方法。选用恰当的方法,项目执行方可严格依照既定计划推进施工,且在出现进度偏差时可及时实施管控。本研究旨在对比横道图-S曲线法(Bar Chart-curve-S)与Ms. Project-PDM法在建筑工程项目进度规划与管控中的应用效果。承包商用于项目进度规划与管控的方法为横道图-S曲线法与Ms. Project-PDM法。
提供机构:
figshare
创建时间:
2021-03-29
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作