When moisture seeps into pavement, it expands when it freezes and contracts when it thaws. This flexing of the pavement, combined with the melted water and the stress of vehicular traffic, causes pav
All pothole repairs performed by the City of Winnipeg's Public Works Department. One pothole is classified as 25 kg of fill material. Material amounts are pro-rated by length of geometry capture per e