25 kVA Wind-Part 2
收藏DataCite Commons2020-11-20 更新2025-04-16 收录
下载链接:
https://ieee-dataport.org/documents/25-kva-wind-part-2
下载链接
链接失效反馈官方服务:
资源简介:
This dataset is in support of my 2 original Research Papers - (i) " -Connected Wind - Part 1 " and (ii) Part 2 ", submitted to "IEEE Transactions on Energy Conversion". (https://ieeexplore.ieee.org/xpl/RecentIssue.jsp?punumber=60)*These experiments are different from the exisiting approaches in the following ways(a) Simulation takes into account non-linearity viz, damper is non- linear, torque is not constant, backlash from the gears(b)(c)(d)(e)This dataset is related toThis simulation is designed taken into consideration the standards for the India, Delhi conditions, where this wind turbine will get conneced to the substation of the local DISCOM,viz., BSES (Bombay Suburban Electric Supply) Rajdhani Power Limited.Abstract of the above submitted paper*Paper is under review.
本数据集用于支撑我的两篇原创研究论文——(i)《并网风电 第一部分》(原文标题为"-Connected Wind - Part 1")与(ii)《并网风电 第二部分》,已提交至《IEEE Transactions on Energy Conversion》(IEEE能源转换汇刊)。相关链接:https://ieeexplore.ieee.org/xpl/RecentIssue.jsp?punumber=60
*本实验与现有研究方法存在以下差异:(a) 仿真过程纳入了多种非线性因素,包括阻尼器非线性特性、转矩非恒定特性以及齿轮侧隙(backlash);(b)(c)(d)(e)
本数据集关联于
本仿真模型的设计充分结合了印度德里当地的电网运行标准——该风力发电机组将接入当地配电公司(DISCOM)的变电站,具体为BSES(孟买郊区电力供应(Bombay Suburban Electric Supply))德里电力有限公司(Rajdhani Power Limited)。
上述已提交论文的摘要:*本论文目前处于审稿阶段。
提供机构:
IEEE DataPort
创建时间:
2020-11-20



