Regulatory zoning of the Risk Prevention Plan Withdrawal of the Argiles of the municipality of Villecomtal-sur-Arros in the department of Gers. The Regulations of the RPP describe the different requirements and recommendations intended to apply to each of the areas of the regulatory map. These requirements are essentially constructive provisions and are mainly aimed at the construction of new houses. However, some of them also apply to existing constructions. Depending on the type of construction (existing or future), some of these requirements are mandatory or simply recommended. The approved RPP is public utility easement and is enforceable against third parties.
法国热尔省阿尔罗河畔维尔孔塔尔市黏土地块风险预防计划撤回事项的监管区划。 风险预防计划(Risk Prevention Plan,以下简称RPP)的监管细则明确了适用于监管地图各区域的各类要求与建议。此类要求本质上多为施工相关规定,主要针对新建住宅建设,但其中部分条款也适用于既有建筑。根据建筑类型(既有建筑或新建建筑)的不同,部分要求为强制性规定,其余则仅为建议性条款。 经批准的RPP属于公共设施地役权范畴,可对第三方产生强制执行效力。