Proposed Street and Roadworks associated with UK Power Networks' activities
收藏opendatasoft2026-02-19 更新2024-05-31 收录
下载链接:
https://data.opendatasoft.com/explore/dataset/ukpn-proposed-streetworks@ukpowernetworks/table/
下载链接
链接失效反馈官方服务:
资源简介:
Introduction
To ensure we deliver a safe and reliable electricity supply or to invest in our network, we may need to carry out works on highways and footways.
This dataset contains details of our proposed street and roadwork permit applications taking place on the highway within UK Power Networks' footprint.
This report is refreshed daily.
For further information including contact details, please visit https://www.ukpowernetworks.co.uk/our-company/road-works
Methodological Approach
Data Extraction: Data is extracted from Street Manager onto a server every two hours.
Data Upload: Another script is run every two hours to upload onto an FTP server, before passing onto the Open Data Portal.
Quality Control Statement
Quality Control Measures include:
Manual review and correction of data inconsistencies
Use of additional verification steps to ensure accuracy in the methodology
Assurance Statement
The Open Data Team and Streetworks Team worked together to ensure data accuracy and consistency.
Other
Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Open Data Portal Glossary
Download dataset information: Metadata (JSON)
### 引言
为保障安全可靠的电力供应,或是对电网进行投资升级,我方可能需要在公路及人行道开展相关施工作业。
本数据集包含英国电力网络(UK Power Networks)业务覆盖范围内公路上拟开展的街道及道路施工许可申请详情。
本数据集每日更新。
如需获取包括联系方式在内的更多信息,请访问:https://www.ukpowernetworks.co.uk/our-company/road-works
### 方法论框架
数据提取:每两小时从道路管理系统(Street Manager)提取数据并存储至服务器。
数据上传:每两小时运行另一套脚本将数据上传至文件传输协议(FTP)服务器,随后推送至开放数据门户(Open Data Portal)。
### 质量控制声明
质量控制措施包括:
1. 对数据不一致问题进行人工审核与修正
2. 采用额外验证步骤,保障方法论执行的准确性
### 保障声明
开放数据团队与道路施工团队通力协作,保障数据的准确性与一致性。
### 其他
本数据集相关关键术语的定义可在开放数据门户(Open Data Portal)术语表中查阅:开放数据门户术语表。
下载数据集信息:元数据(JSON)
提供机构:
UK Power Networks, Company number 3870728



