five

Gross Irrigation Demand April Schedule: 15 Mm Net, 7 Day Cycle

收藏
Mendeley Data2024-01-31 更新2024-06-28 收录
下载链接:
https://api.odp.saeon.ac.za/catalog/SAEON/go/10.15493/SARVA.BEEH.10000416
下载链接
链接失效反馈
官方服务:
资源简介:
This data set contains the GROSS IRRIGATION DEMAND Schedule:15 mm net, 7 day cycle in South Africa. Gross irrigation demand is the gross irrigation water that needs to be abstracted from a source of water (e.g. dam) to satisfy the irrigated crop`s water requirement. Fixed Cycle / Fixed Amount Irrigation, is assumed to be by overhead irrigation with conveyance, wind/spray drift and interception losses of 10%, 12% and 1.5 day per event thus being assumed, in each case with a 7 day cycle. The 15 mm day net application represents an equivalent of 2 mm water/day actually available to the plant.

本数据集包含南非地区的总灌溉需水量(Gross Irrigation Demand)方案:净灌溉量为15毫米,灌溉周期为7天。 总灌溉需水量指为满足灌溉作物的需水要求,需从水源(例如塘坝)中抽取的总灌溉用水量。 本方案采用固定周期/固定水量灌溉(Fixed Cycle / Fixed Amount Irrigation)模式,假设采用高架灌溉(overhead irrigation),并计入输水损失、风/喷溅漂移损失与截留损失,各损失参数分别为10%、12%以及单次灌溉对应1.5天的损失量,且所有场景均遵循7天的灌溉周期。 本次15毫米的单次净灌溉量,等效于每日可为作物提供2毫米的有效灌溉水量。
创建时间:
2024-01-31
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作