Streamflow data for Albion camp, 1981 - ongoing.
收藏DataONE2024-11-22 更新2025-04-26 收录
下载链接:
https://search.dataone.org/view/https://pasta.lternet.edu/package/metadata/eml/knb-lter-nwt/102/19
下载链接
链接失效反馈官方服务:
资源简介:
This is a summary of discharges from the Green Lakes Basin (7.1 km2
area) and is based on stage records from the control section in the
channel, about 50 m downstream of the culvert under the road at the
Albion camp, and consists of daily flow volumes. Initially,
instrumentation consisted of a Leupold-Stevens A70 float recorder.
The site was initially instrumented with an Omnidata EZ900 data
logger system interfaced to a Keller 1 psi pressure transducer on 29
June 1993. In order to establish cross-calibration between the 2
forms of instrumentation, both were planned to be used through 1994.
In 2005, a Campbell cr10x data logger was installed; it was replaced
by a Campbell cr1000 in 2013.
本数据集为绿湖盆地(Green Lakes Basin,面积7.1 km²)的径流排放汇总成果,数据基于该盆地河道控制断面的水位观测记录。该控制断面位于奥尔比昂营地(Albion camp)道路下涵管下游约50米处,数据集包含日径流量数据。初始监测仪器为Leupold-Stevens A70型浮子式记录仪。1993年6月29日,该站点加装Omnidata EZ900数据采集系统,该系统与Keller 1 psi压力传感器相连。为实现两套监测仪器的交叉率定,二者在1994年全年并行运行。2005年,站点换装Campbell CR10X数据采集器;2013年,该设备被Campbell CR1000替代。
创建时间:
2024-11-22



