宽带可重构射频系统集成芯片发射机的能效与EVM数据集
收藏资源简介:
本项目宽带可重构射频系统集成芯片主要面向车联网、机器人等复杂物联网宽带无线接入应用,在温度16℃,相对湿度40%RH的测试条件下,发射机的高能效与低EVM数据基于直流电源,信号源,频谱仪等测试设备产生,主要记录了宽带可重构射频系统集成芯片中,发射机输出功率23dBm时的功耗以及发射机EVM的测试结果。
This broadband reconfigurable radio frequency (RF) system-on-chip (SoC) developed in this project is primarily intended for complex Internet of Things (IoT) broadband wireless access applications such as vehicle networking and robotics. Under the test conditions of 16°C and 40% relative humidity (RH), the data regarding the high energy efficiency and low error vector magnitude (EVM) of the transmitter was collected using test instruments including DC power supplies, signal generators, and spectrum analyzers. This dataset mainly documents the test results of power consumption and transmitter EVM when the output power of the transmitter reaches 23 dBm for the aforementioned broadband reconfigurable RF SoC.




