Renewable energy generation plants need to be reduced in their feed-in due to grid constraints in order to ensure grid stability. This process is called **redispatch**. The data shall include information on the number of hours and the number of EEG installations that had to be reduced in order to ensure grid stability. *Both the data of current and forecast EEG measures have been compiled with the greatest possible care and prepared for presentation. Nevertheless, in particular recording and transmission errors as well as incomplete delivery by third parties cannot be excluded. Schleswig-Holstein Netz AG therefore expressly reserves the right to change the published data and presentations and assumes no liability for the topicality, completeness and correctness.* Visualisation of the data: https://www.netzampel.energy/shnetz

为保障电网稳定,受电网约束影响,需对可再生能源发电场站的上网电量进行削减,该过程被称为**电网重新调度(redispatch)**。 本数据集包含为保障电网稳定而需实施电量削减的小时数,以及受调整影响的德国可再生能源法(Erneuerbare Energien Gesetz, EEG)装机数量。 当前及预测的EEG相关调控措施数据均已尽可能审慎地编制并整理以供展示。然而,仍无法完全排除记录与传输错误、第三方交付不完整等问题。因此,石勒苏益格-荷尔斯泰因电网股份公司(Schleswig-Holstein Netz AG)明确保留修改已发布数据及展示内容的权利,且不对数据的时效性、完整性与准确性承担任何责任。 数据可视化页面:https://www.netzampel.energy/shnetz

二维码
社区交流群
二维码
科研交流群
商业服务