five

Instance dataset for resource-constrained project scheduling with diverging material flows

收藏
NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://data.mendeley.com/datasets/z9gfh66mj4
下载链接
链接失效反馈
官方服务:
资源简介:
This dataset is motivated by the problem of scheduling a project with diverging material flows as presented in [1]. Diverging material flows are released during the execution of the project and are subject to limited processing and storage capacities. Typical examples are nuclear dismantling or other deconstruction/demolition projects, where large amounts of material must be classified, scanned for hazardousness, and processed accordingly. The problem setting is mathematically described as a resource-constrained project scheduling problem with cumulative resources (RCPSP/c). The RCPSP/c deals with finding a project schedule with minimal makespan that satisfies temporal, renewable resource, and cumulative resource constraints. This dataset is described by the data article [2]. This data article provides details about the naming of the instances and solutions, the instance generation procedure, the heuristic methods used for computing the solutions, and the mathematical problem formulation. [1] M. Gehring, R. Volk, F. Schultmann, On the integration of diverging material flows into resource‐constrained project scheduling, Eur J Oper Res 303 (2022) 1071–1087. https://doi.org/10.1016/j.ejor.2022.03.047. [2] M. Gehring, R. Volk, F. Schultmann, Instance dataset for resource-constrained project scheduling with diverging material flows, Data Brief 48 (2023), Article no: 109279. https://doi.org/10.1016/j.dib.2023.109279.
创建时间:
2023-12-12
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作