SAEON calculated a series of pressure maps to relate population, economic activity and biomass potential to the distribution of current and planned infrastructure. The infrastructure that was considered included: * Operational and decommissioned power stations; * Planned new energy infrastructure, based in NERSA permits; * Eskom planned and current transmission, distribution, and substation infrastructure; * Agriculture infrastructure - silos; * Sawmills and sugar mills; * Waste water treatment works and solid waste disposal sites. In each case, an assessment was made on the basis of four categories (below or over median): 1. Close to infrastructure, and high density of population, economic activity, or biomass potential (possibly problematic); 2. Not close to infrastructure, and high density of population, economic activity, or biomass potential (problematic); 3. Close to infrastructure, and low density of population, economic activity, or biomass potential (not problematic); 4. Not close to infrastructure, and low density of population, economic activity, or biomass potential (not problematic)

SAEON构建了一系列压力分布图,用于关联人口、经济活动与生物质潜能,以及当前及规划中基础设施的分布状况。本次考量的基础设施包括: * 已运营及退役的发电厂; * 基于南非能源监管局(NERSA)许可的规划中新能源基础设施; * 南非国家电力公司(Eskom)规划及当前在用的输电、配电与变电站基础设施; * 农业基础设施——筒仓; * 锯木厂与糖厂; * 污水处理厂及固体废物处置场。 针对每一类评估对象,均依据四类划分标准(以中位数为界)开展评估: 1. 临近基础设施,且人口、经济活动或生物质潜能密度较高(或存在潜在问题); 2. 远离基础设施,且人口、经济活动或生物质潜能密度较高(存在问题); 3. 临近基础设施,且人口、经济活动或生物质潜能密度较低(无问题); 4. 远离基础设施,且人口、经济活动或生物质潜能密度较低(无问题)
创建时间:
2024-01-31
二维码
社区交流群
二维码
科研交流群
商业服务