遇见数据集
官方服务:

资源简介:

This report details the results of exploration conducted by Hammer Metals (“Hammer”) Ltd over EPM 26776 for the period from 16th November 2019 to the year ending 15th November 2020. During the period Hammer undertook data review, geological analysis and target generation over EPM26776. Reconnaissance field sampling was conducted, with 2 rock chip samples collected. MineGeoTech consultancy undertook a pit optimization of the Overlander deposits.

创建时间:
2025-12-15
二维码
社区交流群
二维码
科研交流群
商业服务