five

Data for: Molt timing and duration of northern elephant seals

收藏
DataONE2024-03-11 更新2024-06-08 收录
下载链接:
https://search.dataone.org/view/sha256:2401eb1324b533bea4680b3e889e5914de2fd1dc72c122e85b934b88477adbec
下载链接
链接失效反馈
官方服务:
资源简介:
Life history timing influences many ecosystem processes including predator-prey interactions, information transfer, disease transmission, ecosystem services, and resource subsidies. Many animals and plants have species-typical annual cycles, but individuals vary in their exact timing of life history events. However, quantifying individual variation in the timing and duration of life history events requires longitudinal sampling and may necessitate advanced analytical techniques if observations are imperfect or asynchrony is prevalent. Our goal was to examine factors that influence variation in molt duration and timing across individual northern elephant seals (Mirounga angustirostris). We quantified the onset and progression of fur loss in 1,178 individual seals over seven years. We found a wide range of molt start dates (95% interval spanning 60.1 days within a single age-sex category) and rapid molt progression (6.0 days in adult females and 10.8 and 10.3 days in juvenile females and ..., , , # Molt timing and duration of northern elephant seals --- Six .csv files contain processed data (each row is a year-seal combination), and one .r file contains the code to fit the models and reproduce the figures. ## Description of the Data and file structure *Headers in the \"MoltMSFinal.csv\" file are as follows:* X = unique year-identifier for each seal age = animal age, years N = number of observations for that year-seal best = molt date (50% progress), days since January 01 slope = molt duration (days) card = if a number is present, the female had a pup during the breeding season sex = male or female arrival = modeled arrival date, days since January 01 departure = modeled departure date, days since January 01 tenure = haul-out duration, days agesexcat = age-sex category *Headers in the \"MoltMSFinalModelOut.csv\" file are as follows:* graphx = date, days since January 01 pred1 = model fit (predicted molt progress, %) *Headers in the \"MoltMSFinalCircular.csv\" file are as follow...
创建时间:
2025-07-28
二维码
社区交流群
二维码
科研交流群
商业服务