A building permit is required for all onshore wind turbines over 12 metres high (Article R.421-2 of the Urban Planning Code). The application for a building permit is filed in the town hall. A prior assessment of the environmental consequences (landscape, noise, etc.) must be carried out by the project leader prior to any installation of wind turbines. This environmental assessment must be included in the file in the form of an impact statement for wind turbines less than 50 metres or in the form of an impact assessment for wind turbines over 50 metres. The file also contains the geographical location of the wind turbines in the park.

所有高度超过12米的陆上风力涡轮机(onshore wind turbines),均需申请建筑许可,依据为《城市规划法典》(Urban Planning Code)第R.421-2条。建筑许可的申请需向市政厅提交。在启动任何陆上风力涡轮机安装作业前,项目负责人需先行开展环境影响评估,评估范围涵盖景观、噪声等方面。该环境评估文件需纳入申请材料:若陆上风力涡轮机高度低于50米,需以风力涡轮机影响声明(impact statement)的形式提交;若高度超过50米,则需以风力涡轮机影响评价(impact assessment)的形式提交。申请材料还需包含该风电场内各风力涡轮机的地理位置信息。

二维码
社区交流群
二维码
科研交流群
商业服务