five

Melbourne Metro Tunnel Project Future Station Entrances

收藏
Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/melbourne-metro-tunnel-station-entrances/2825655
下载链接
链接失效反馈
官方服务:
资源简介:
This point layer represents the location of future station entrances for North Melbourne (Arden) Station, part of the Melbourne Metro Tunnel Project. The Concept Design shown in this data reflects the indicative design shown in the Project's Environmental and Effects Statement (EES) which was publicly circulated with the community in May 2016.\n\nThe Metro Tunnel Project comprises two twin 9 kilometre tunnels with five new underground stations, including two city stations directly connected to Flinders Street and Melbourne Central. It will connect the Sunbury and Cranbourne / Pakenham lines for the first time, creating a new end-to-end train line through the inner city. Construction of the Metro Tunnel began in 2017 and it is due to be completed by 2026.\n\nThe Metro Tunnel Project comprises various works packages. As the project progresses and designs are further developed and approved, an updated dataset will be made available.

本点图层标注了墨尔本地铁隧道工程(Melbourne Metro Tunnel Project)所属北墨尔本(阿登)站(North Melbourne (Arden) Station)的未来出入口位置。本数据所展示的概念设计,与该项目于2016年5月面向社会公众公示的《环境影响声明(Environmental and Effects Statement, EES)》中的示意性设计方案一致。 墨尔本地铁隧道工程包含两条各长9公里的并行双管隧道及五座新建地下车站,其中两座城市车站可直接接驳弗林德斯街站(Flinders Street)与墨尔本中央车站(Melbourne Central)。本项目将首次实现Sunbury线与克兰伯恩/帕肯厄姆(Cranbourne / Pakenham)线的互联互通,打造一条贯穿中心城区的全新贯通式列车线路。该工程于2017年正式动工,预计2026年建成完工。 墨尔本地铁隧道工程下设多个工程标段。随着项目推进,设计方案将进一步优化并完成审批,届时将发布更新后的数据集。
提供机构:
data.vic.gov.au
二维码
社区交流群
二维码
科研交流群
商业服务