Experimental dataset: Neighbourhood Structures and Ranking Operators for the Interval Job Shop Scheduling Problem
收藏资源简介:
The experimental study compares five neighbourhood variants($N_1$, $N_2$, $N_3$, $N_{\text{ext}}$, $N_8$) and four interval-ranking operators(EV, LEX1, LEX2, YX) for the Interval Job Shop Scheduling Problem (IJSP), on 82benchmark instances ranging from $10\times10$ to $50\times20$ operations. Threeexperimental phases are reported: - **Phase A** — common-hyperparameter hill climbing for the $5 \times 4$ operator comparison (Section 8.2 of the paper).- **Phase B** — per-neighbourhood irace-tuned tabu search for the head-to-head neighbourhood comparison (Section 8.3).- **Phase C** — comparison of the best Phase B configuration against three published IJSP solvers (Section 8.4). Each (instance, configuration) pair is executed for 30 independent runs.



