SP&AIC
收藏Mendeley Data2026-04-18 收录
下载链接:
https://data.mendeley.com/datasets/3nyvj834p7
下载链接
链接失效反馈官方服务:
资源简介:
Data deposition for the paper ‘Project schedule expediting under structural and parametric uncertainty’ by Nazimko V. and Zakharova L.
File 2021.xlsx contains:
List ‘initial data’ – min, mode, max duration of the tasks taken from Tolentino Rena, R.A. (2009). Project management: A simulation-based optimization method for dynamic time-cost tradeoff decisions (M.S. thesis) Rochester, NY: Rochester Institute of Technology
List ‘Critical Paths’ – critical paths and their frequencies (probabilitiwes) received by SP and AIC run
List ‘Task criticality’ – tasks criticality received by SP and AIC run
List ‘Results’ – results of the run of SP and AIC. These results are dublicated in the file ‘result_realdstr.dat’ as output file of SP and AIC running.
创建时间:
2021-01-11



