five

SP&AIC

收藏
Mendeley Data2026-04-18 收录
下载链接:
https://data.mendeley.com/datasets/3nyvj834p7
下载链接
链接失效反馈
官方服务:
资源简介:
Data deposition for the paper ‘Project schedule expediting under structural and parametric uncertainty’ by Nazimko V. and Zakharova L. File 2021.xlsx contains: List ‘initial data’ – min, mode, max duration of the tasks taken from Tolentino Rena, R.A. (2009). Project management: A simulation-based optimization method for dynamic time-cost tradeoff decisions (M.S. thesis) Rochester, NY: Rochester Institute of Technology List ‘Critical Paths’ – critical paths and their frequencies (probabilitiwes) received by SP and AIC run List ‘Task criticality’ – tasks criticality received by SP and AIC run List ‘Results’ – results of the run of SP and AIC. These results are dublicated in the file ‘result_realdstr.dat’ as output file of SP and AIC running.
创建时间:
2021-01-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作