Parameters and load data
收藏官方服务:
资源简介:
The parameters and load data of the modified Barry Island HE-IES and an industrial park HE-IES used in "Data-Driven Initialization-Based Coupled and Decoupled Transient Modeling and Analysis of Heat and Electricity Integrated Energy Systems". The original data is refered from "X. Qin, X. Shen, Y. Guo, Z. Pan, and Q. Guo, “Combined electric and heat system testbeds for power flow analysis and economic dispatch,” CSEE J. Power Energy Syst., vol. 7, no. 1, pp. 34–44, Jan. 2021.".
提供机构:
figshare创建时间:
2021-06-20



