five

Drilling data at MeBo200 drill site GeoB23234-1, South China Sea@en

收藏
DataONE2026-03-31 更新2026-05-19 收录
下载链接:
https://search.dataone.org/view/sha256:b96c3eb4f140bd94f21eddae4ad9acac051616c8c7c67c456d5882447ad0aacd
下载链接
链接失效反馈
官方服务:
资源简介:
Drilling data at site GeoB23231-1 were collected during operation of the sea floor drill rig MARUM-MeBo200 during research expedition SO266 in November 2018 on the northern part of the summit of Four Way Closure Ridge at the South China. Vertical movements of the drill head are monitored with an electromagnetic encoder type TXN 11551 FD by TWK Supreme Sensoric GmbH. Drilling depth was calculated by summing up the drill head movements with the drill being connected to the drill string. The accuracy of the calculated drilling depth is about 0.1%. Flow rate of the flush water was measured within the pressure line of the flush water pump by using a RN3/32/15SP360 flowmeter by UK Flowtechnik. The accuracy of the measurement is better than 0.2%
创建时间:
2026-04-21
二维码
社区交流群
二维码
科研交流群
商业服务