Study using 13 production systems of a housing project in Mexico over 235 days. The production systems are divided into two groups: Case A and Case B. Case A gathers six production systems and Case B seven. In both cases, the production systems are arranged in a way that the output of a system is the input of the subsequent system as in a queuing system. The inputs/outputs are jobs that comprehend in a few activities assigned to a crew. For instance, the crew assigned to the job ja0 should complete the foundation, excavation, and backfill of each house. Once the crew finishes ja0 of the house, it moves to the next house leaving room for the next crew, which was assigned to ja1, and so on until all the 50 houses are completed. For this example, ja0 is the input of the production system A1, and ja1 is the output.
创建时间:
2016-11-29
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作