遇见数据集

Centipod WEC, Advanced Controls, Baseline LCOE

收藏
DataCite Commons2021-07-10 更新2025-04-09 收录
官方服务:

资源简介:

Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.

创建时间:
2019-02-08
二维码
社区交流群
二维码
科研交流群
商业服务