five

Tropical cyclone Eloise in Mozambique (2021-02-10)

收藏
DataCite Commons2026-03-10 更新2026-05-04 收录
下载链接:
https://data.jrc.ec.europa.eu/dataset/f5ee412c-bea3-4151-8973-89fab745d850
下载链接
链接失效反馈
官方服务:
资源简介:
<br> Activation date: 2021-02-10 <br> Event type: Storm <br> <br> Activation reason: <br> The CEMS Risk and Recovery Standard has been activated to support emergency operations or recovery after a major natural disaster such as flooding or tropical cyclones in Mozambique. To this scope, it has been requested to assess the effects of the Eloise Tropical cyclone that hit Mozambique starting from the second part of January 2021. Two areas of interest (AOIs) in Mozambique have been analysed. The AOIs are focused on the Pungwe River, in particular on its mouth where is present also the important coastal city of Beira. The AOIs have been hit by 25 centimetres of rain in 24 hours added to a strong wind (160 km/h) and storm surge (1.5 m on average).Proposed solution and resultsWith the aim of the flooded zone extraction on both AOIs, the flood delineation (P04) products were provided using a RADARSAT-2 image acquired on the 22nd January 2021, and from two Sentinel-1 images acquired on 25th and 26th of January 2021. The water depth range has been estimated between 0 and 3 m (1m on average). Figure 1 shows for AOI01 and AOI02 the flooding extracted by P04 products on 22.02.2021 (Figure 1 top left-top right), 25.02.2021 (Figure 1 middle left-middle right) and finally 26.02.2021 (Figure 1 bottom left-bottom right). Figure 1 Flooding provided by P04 Flood delineation caused by tropical cyclone Eloise event  <br> <br>
提供机构:
European Commission, Joint Research Centre
创建时间:
2026-03-10
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作