Results for tower-like structure with 3 out of 9 sensor positions
收藏官方服务:
资源简介:
The data shows the results of the optimization process for FIM and MSE with using the determinant criterion and also simply using MSE as evaluation criterion. A further description of the data is given in data_info.txt.
创建时间:
2024-01-31



