five

Intermittent aeration on carbon and nitrogen turnover in landfill simulation reactors

收藏
NIAID Data Ecosystem2026-03-10 收录
下载链接:
https://www.ncbi.nlm.nih.gov/bioproject/PRJNA453670
下载链接
链接失效反馈
官方服务:
资源简介:
In the present research, six landfill simulation reactors (Ca, Cb, Ia, Ib, Aa, Ab) were filled with municipal solid waste and managed in order to compare an intermittent solution for the aeration of waste with continuous air injection. The experiment was divided in two main phases: landfill simulation (LS) and remediation simulation (RS). The LS phase was made by a pre-aeration, lasted 13 days, and a 53-days long anaerobic period. The RS phase lasted 142 days during which the six columns were managed in three different ways: Ca and Cb were continuously aerated; Ia and Ib were intermittently aerated using the same flux; Aa and Ab were maintained anaerobic.
创建时间:
2018-04-26
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作