Table 1 - 1 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
收藏资源简介:
Table 1-1: Preliminary ESIA Report Structure ChapterContents1. Introduction (this chapter)An overview of the Project, purpose and structure of the ESIA report, and the Project team.2. Project descriptionDescription of the proposed facilities and structures, construction methods, power plant operation, anticipated waste streams and other key aspects of the Project that are pertinent to the ESIA.3. Legal and Policy FrameworkSummary of the key national legislation and regulations in the sphere of environment and social aspects applicable to the Project, pertinent international conventions, standards and guidelines.4. Assessment MethodologyDescription of the methodology used to determine sensitivity, magnitude and significance of impacts.5. Environmental and Social BaselineDescription of environmental and social baseline conditions, including physical environment, habitats, flora and fauna, local socio-economic conditions.6. Initial Impact AssessmentDescription of the individual impacts particularly those that will require further mitigation to be developed.7. Mitigation and Enhancement MeasuresDescription of the required mitigation measures to be implemented through the project ESMP. This is either site specific mitigation or general adherence to good international industry practice.8. Summary and RecommendationsOverall summary of the project ESIA and any key impacts or mitigation that should be implemented.



