five

ICC Vehicle Volume Data

收藏
OPEN DATA NETWORK2023-04-12 更新2024-10-26 收录
下载链接:
https://www.opendatanetwork.com/dataset/opendata.maryland.gov/8d75-q6az
下载链接
链接失效反馈
官方服务:
资源简介:
This dataset shows the number of vehicles that have passed under a gantry on that particular day. This dataset does not show trips, it only shows segments. Segments are compiled to make trips. There are 10 gantries on the InterCounty Connector (ICC) and 5 interchanges. The eastbound gantries are 101, 105, 107, 109, 113, and the westbound gantries are 102, 106, 108, 110, 114. The dataset has a column for each gantry going east and west, then a total for each gantry. The ICC is an all electronic tolling road which opened February 2011. The first opening was a partial opening, with only the first interchange being available for use.There was a free period from February 23, 2011 through March 6, 2011. The rest of the ICC opened in November 2011, and there was another free period from November 22, 2011 through December 4, 2011. There are a few days where a low number of traffic passed under gantries (rows 196,198, 269,271...), these were either testing periods or construction vehicles.
提供机构:
opendata.maryland.gov
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作