Table 1 in Saidabad Water Treatment Plant Project, Phase III
收藏资源简介:
Table 1: List of PPEs to be worn at the construction site Sl. No.Works/ Equipment UseSafety Measures for Workers and/or Work Areas1Common Construction WorksHH, STB, HG2Earth-worksHH, STB, HG3Electric worksRSB, HG4Wood worksHH, STB, HG5Road pavingHH, STB, HG, BP, FM6CranesHH, STB, HG, WB7Pile DriverHH, STB, HG, EP, WB8Arc WelderHH, WV, HG9Bull DozerHH, STB, WB10Heavy RollerHH, STB, HG, WB11Concrete MixerHH, STB, HG, WB12Fork LiftHH, HG, STB, WB13Percussion DrillHH, STB, HG, WB, EG, EP, WB14Sledge/Pick HammerHH, STB, HG, WB15VibratorHH, STB, HG, WB16Working on ScaffoldsHH, STB, HG, WB Note: HH = Hard Hat, STB = Steel-tipped Boot, HG = Hand Gloves, BH = Body Harness WB = Waist Belt, EM = Ear Muff, EP = Ear Plug, WV = Welding Visor, FM = Face Mask, BP = Body Protective Apron, RSB = Rubber Soled Boot, EG = Eye protection Glasses