five

Reproducible model for comparing risk-averse hydropower medium-term scheduling in centralized and liberalized power systems

收藏
Mendeley Data2026-04-18 收录
下载链接:
https://data.mendeley.com/datasets/4w3gfs993b
下载链接
链接失效反馈
官方服务:
资源简介:
This dataset supports reproduction of the analysis of risk aversion in hydropower medium-term scheduling in centralized and liberalized power systems presented in the associated paper "Whose heads are we keeping above water? Impacts of risk aversion on hydropower medium-term scheduling" (see Related links). Input (Data folder) and output (Results folder) data for the stylized case study of the Norwegian and Swedish parts of the Nordic Power System are provided alongside two models (.jl). The first model is a central dispatch optimization model (OM) with system cost minimization, and the second is an equilibrium model (EM) with revenue-maximizing producers. For detailed description of the models and the data, please refer to Sections 4, 5, and 6 of the associated paper.
创建时间:
2025-01-23
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作