Table-ES- 1. Institutional roles and responsibilities in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ

收藏
Zenodo2025-10-21 更新2026-05-26 收录
官方服务:

资源简介:

Table-ES-1. Institutional roles and responsibilities Project stageResponsible organizationResponsibilitiesPre-constructionEGCB Ltd. (with the assistance from project consultant)i. Prepare EIA consistent with GOB and WB requirements ii. Conduct public consultation during EIA iii. Fulfil GOB requirements iv. Make EIA reports available to the web site v. Incorporate mitigation measures into engineering design and technical specificationvi. Incorporate environmental mitigation and monitoring measures into contract document

提供机构:
World Bank (WB)
创建时间:
2025-10-13