Roadway Construction Moratoriums
收藏data.cityofchicago.org2024-12-10 更新2025-01-22 收录
下载链接:
https://data.cityofchicago.org/Transportation/Roadway-Construction-Moratoriums/ndbz-vy4e/about_data
下载链接
链接失效反馈官方服务:
资源简介:
Moratoriums are established by the Department of Transportation as a method of protecting reconstructed or repaved roadways within the boundaries of the city.
By having access to this Moratorium list in advance, contractors or utilities with projects that require excavation of roadways can more effectively plan and review conflicts that will be encountered. Currently, roadway sections with active moratoriums have special consideration as to method and size of restoration, and additionally, increased permit fees. Three moratorium types are displayed in this dataset:
1. <b>Street Construction</b> is used when the street has been reconstructed. By City ordinance, the moratorium is ten (10) years and during this period permit fees are doubled.
2. <b>Street Resurfacing</b> is used when the road has been repaved. By City ordinance, the moratorium is five (5) years and during this period permit fees are doubled. A degradation fee may also be applied for any Street Construction or Street Resurfacing moratoriums.
3. <b>Median or Median Landscaping</b> is used where landscaped medians or planters exist on the street median. For these moratorium types, there is no fee adjustment; however, if a construction permit is being requested, the applicant will be directed to review the planned project with the Department of Transportation/Division of Engineering staff for special instructions on how to properly protect or reconstruct street medians.
For more information, please see https://www.chicago.gov/city/en/depts/cdot/provdrs/construction_information/svcs/roadway_constructionmoratoriums.html.
交通部设立暂缓令,作为保护城市范围内重建或重新铺设的道路的一种手段。通过提前获取此暂缓令清单,需要进行道路挖掘项目的承包商或公用事业公司能够更有效地规划和审查将遇到的冲突。目前,拥有活跃暂缓令的道路部分在恢复方法和规模上享有特殊考虑,并且还需支付增加的许可费用。本数据集展示了三种暂缓令类型:
1. <b>街道建设</b>用于街道重建时。根据城市条例,暂缓令为期十年(10年),在此期间许可费用翻倍。
2. <b>街道翻新</b>用于道路重新铺设时。根据城市条例,暂缓令为期五年(5年),在此期间许可费用翻倍。对于任何街道建设或街道翻新暂缓令,还可能征收退化费用。
3. <b>中央分隔带或中央分隔带绿化</b>用于街道中央存在绿化分隔带或花坛的情况。对于这些暂缓令类型,无需调整费用;然而,如果申请建设许可,申请人将被指导与交通部/工程司工作人员审查计划项目,以获取关于如何正确保护或重建街道中央分隔带的专业指导。
更多详细信息,请参阅https://www.chicago.gov/city/en/depts/cdot/provdrs/construction_information/svcs/roadway_constructionmoratoriums.html。