Arbitrage Opportunities | Ethereum EVM Blockchain Data
收藏资源简介:
BlockDB Arbitrage Opportunities stores estimated profitability for known paths at specific (block_number, tx_index, log_index) positions, including directional evaluation (is_reversed), per-hop amounts aligned with token_path, profit in the start token and in USD, and USD price of the start token. Pair with path definitions and status tables to build end-to-end arbitrage analytics and backtests grounded in the same lineage graph as other BlockDB processed datasets. <p><br/></p> **Sample Notice** This dataset contains **a small sample** of the full BlockDB Arbitrage Opportunities dataset. It is provided **for evaluation, research, and interoperability testing only**. If you need full historical coverage, real-time streaming, or end-of-day (EOD) exports please contact us via contact form on Snowflake Marketplace. <p><br/></p> **Chains and Coverage** ETH, BSC, Base, Arbitrum, Unichain, Avalanche, Polygon, Celo, Linea, Optimism (others on request). Full history from chain genesis; reorg-aware real-time ingestion and updates. <p><br/></p> **Join Keys** PATH_ID → BLOCKDB0801_ARB_PATHS_V1. POOL_UIDS / TOKEN_PATH → pools and ERC-20 registry. Optional join to BLOCKDB0605_TOKEN_TO_FIAT_VWAP or TVL tables for contextual analytics (not required for stored USD fields). <p><br/></p> **Lineage** _TRACING_ID and _PARENT_TRACING_IDS link each opportunity row to path, pricing, and reserve subgraphs used in the estimate.
Arbitrage Opportunities | Ethereum EVM Blockchain Data 数据集概述
数据集基本信息
- 数据集名称: Arbitrage Opportunities | Ethereum EVM Blockchain Data
- 提供商: BlockDB
- 访问模式: 免费试用 (Free to try)
- 试用状态: 可用 (Trial: Available)
- 数据集标识: BLOCKDB0901_ARB_OPPORTUNITIES_V1 (Dataset 0901 — Arbitrage opportunity snapshots)
数据集描述
BlockDB Arbitrage Opportunities 存储了在特定链上位置(区块号、交易索引、日志索引)已知路径的预估盈利能力数据,包括方向评估(是否反向)、与代币路径对齐的每跳数量、以起始代币和美元计价的利润,以及起始代币的美元价格。可与路径定义和状态表结合,构建端到端的套利分析和回测,这些分析基于与其他BlockDB处理数据集相同的谱系图。
样本说明
此数据集包含完整BlockDB套利机会数据集的一小部分样本。仅用于评估、研究和互操作性测试。如需完整的历史覆盖、实时流式传输或日终导出,请通过Snowflake Marketplace上的联系表单联系我们。
支持的链与覆盖范围
- 支持链: ETH, BSC, Base, Arbitrum, Unichain, Avalanche, Polygon, Celo, Linea, Optimism (其他链可应要求提供)
- 数据覆盖: 从链创世区块开始的完整历史数据;支持重组感知的实时摄取和更新。
数据表结构 (BLOCKDB0901_ARB_OPPORTUNITIES_V1)
| 列名 | 数据类型 | 描述 |
|---|---|---|
| BLOCK_NUMBER | Number | 区块号 |
| BLOCK_TIME | Timestamp_TZ | 区块时间戳 |
| TX_INDEX | Number | 交易索引 |
| LOG_INDEX | Number | 日志索引 |
| PATH_ID | Binary | 路径标识符 |
| IS_REVERSED | Boolean | 路径方向是否反向 |
| POOL_UIDS | Array | 流动性池唯一标识符数组 |
| TOKEN_PATH | Array | 代币地址路径数组 |
| AMOUNTS | Array | 每跳代币数量数组 |
| PROFIT_IN_TOKENS | Varchar | 以起始代币计价的利润 |
| TOKEN_VWAP_USD | Varchar | 起始代币的美元VWAP价格 |
| PROFIT_IN_USD | Varchar | 以美元计价的利润 |
| _TRACING_ID | Binary | 谱系追踪标识符 |
| _PARENT_TRACING_IDS | Array | 父级谱系追踪标识符数组 |
| _CREATED_AT | Timestamp_TZ | 记录创建时间 |
| _UPDATED_AT | Timestamp_TZ | 记录更新时间 |
关联键
- 主关联键:
PATH_ID→BLOCKDB0801_ARB_PATHS_V1 - 其他关联:
POOL_UIDS/TOKEN_PATH→ 流动性池和ERC-20注册表。 - 可选关联: 可关联到
BLOCKDB0605_TOKEN_TO_FIAT_VWAP或 TVL 表以进行上下文分析(存储的美元字段无需此关联)。
数据谱系
_TRACING_ID 和 _PARENT_TRACING_IDS 将每个机会行链接到用于估算的路径、定价和储备子图。
业务需求应用场景
区块链分析
- 按路径和链分析历史套利盈亏分布
- 套利机会与波动性和Gas费用机制的相关性分析
- 具有行级可审计性的策略研究和模拟输入
使用示例
按美元利润排序的顶级机会(样本时间窗口)
sql SELECT block_time, path_id, is_reversed, profit_in_usd, profit_in_tokens FROM PUBLIC.BLOCKDB0901_ARB_OPPORTUNITIES_V1 WHERE block_time >= DATEADD(day, -1, CURRENT_TIMESTAMP()) ORDER BY profit_in_usd DESC NULLS LAST LIMIT 100;
数据刷新与可用性
- 刷新类型: 静态数据产品 (Static data product)
- 云区域可用性: AWS (列出多个区域,包括非洲开普敦、亚太雅加达、亚太马来西亚、亚太孟买等)
法律条款
- 条款类型: 标准 (Standard)




