five

Flowshop scheduling problems with release and delivery dates

收藏
NIAID Data Ecosystem2026-03-10 收录
下载链接:
https://data.mendeley.com/datasets/m2wcd42pvy
下载链接
链接失效反馈
官方服务:
资源简介:
We randomly generated two groups of 150 test instances for the problem addressed in this work. The first group contains instances with 100 jobs which must be processed on 2 machines. In the second group, the instances have 200 jobs with the same conditions as before. The instance naming follows the pattern knar. For example, instance k2n100a0.1r0.7 has N = 100 jobs; K = 2 delivery dates; parameter alpha, used to give the first delivery date, is alpha = 0,1; and R = 0,7 is the same parameter R used to define the release date of each job.
创建时间:
2017-11-21
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作