Flowshop scheduling problems with release and delivery dates
收藏NIAID Data Ecosystem2026-03-10 收录
下载链接:
https://data.mendeley.com/datasets/m2wcd42pvy
下载链接
链接失效反馈官方服务:
资源简介:
We randomly generated two groups of 150 test instances for the problem
addressed in this work. The first group contains instances with 100 jobs which
must be processed on 2 machines. In the second group, the instances have
200 jobs with the same conditions as before. The instance naming follows the pattern knar. For example,
instance k2n100a0.1r0.7 has N = 100 jobs; K = 2 delivery dates; parameter
alpha, used to give the first delivery date, is alpha = 0,1; and R = 0,7 is the same
parameter R used to define the release date of each job.
创建时间:
2017-11-21



