We randomly generated two groups of 150 test instances for the problem addressed in this work. The first group contains instances with 100 jobs which must be processed on 2 machines. In the second group, the instances have 200 jobs with the same conditions as before. The instance naming follows the pattern knar. For example, instance k2n100a0.1r0.7 has N = 100 jobs; K = 2 delivery dates; parameter alpha, used to give the first delivery date, is alpha = 0,1; and R = 0,7 is the same parameter R used to define the release date of each job.