Injection rate time series from August 10, 2011, to October 20, 2011, for Injection Wells IW-1, IW-3, and IW-4 at the North District Wastewater Treatment Plant, Miami-Dade County, Florida
收藏DataONE2017-04-12 更新2024-06-26 收录
下载链接:
https://search.dataone.org/view/343f6f90-f418-4b02-ad74-b05fa1d8144e
下载链接
链接失效反馈官方服务:
资源简介:
U.S. Geological Survey, in cooperation with Miami-Dade County, performed a sequential, aquifer stress test from August 15 to October 12, 2011, on the Floridan aquifer system at the North District Wastewater Treatment Plant, in Miami-Dade County, Florida. Miami-Dade County stressed the Floridan aquifer system with four municipal injection wells at the North District. Miami-Dade County, Miami-Dade Water and Sewer Department measured injection rate with a supervisory control and data acquisition system from August 10, 2011, to October 20, 2011, for Injection Wells IW-1, IW-3, and IW-4. These data are part of a larger data set that describe the stress test at the North District (King, 2016, http://dx.doi.org/10.5066/F7QZ2819).
创建时间:
2017-04-13



