Table 2 - 3 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
收藏官方服务:
资源简介:
Table 2-3: Water Requirements during Construction ItemNumberConcrete RequirementWater RequirementInverter bases (1.6 x 2.8 x65950m3300m30.5m)Substation and office building11,200m3240m3Allow 30% extra for--75m3waste/washdownGeneral construction water--2,985m3needsTotal Construction Water3,600m 3Water needs for workers3651-10,658m3Total Potable Water10,658m 3